While cargo waits on the Kapıköy line in Van, warehouses fill up, shelves exceed the design quota; fire safety systems continue to operate according to the layout on the day they were installed. ASPEK conducts planned regional inspections from its Ankara headquarters to perform periodic maintenance on fire detection, water-based and gas suppression systems in warehouses and bonded stores, organized industrial zone facilities, hotels, and public buildings in Van.
Wagons waiting at Kapıköy, warehouse filling in Van
In Van, fire safety discussions for warehouses start with shelf height. Cargo wagons transported by ferry across the lake from Tatvan are unloaded in Van; those heading to Iran are pulled to Kapıköy Border Gate in Saray district and continue toward Tebriz. A transshipment route means the cargo waits in the city for a period of time ; the counterpart to this waiting is the warehouse. With customs procedures, paperwork, and vehicle sourcing, enclosed areas fill up, corridors narrow, and pallet stacking rises above the design elevation.
The piping, however, continues to operate according to its original layout on installation day, not according to today's stacking. When the space between the sprinkler head and the topmost pallet closes, water coverage cannot reach into the shelf; smoke remains trapped behind the stacking that blocks the upper level. In our warehouse and storage facility maintenance visits in Van, the first place we check is not the control panel, but the gap between the ceiling and the cargo.
Measure and document your warehouse dimensions
The phrase "we have a large warehouse" does not help us. If you provide these five lines, we can determine whether the system is adequate for current conditions before we travel:
- Enclosed area (m²) and clear ceiling height
- Shelf type, topmost pallet level, whether inter-shelf sprinklers are present
- Type of commodity: packaging, plastic, food, aerosol, battery-powered equipment
- Presence of pump room; diesel or electric, tank capacity
- Presence of forklift charging area and customs zone
Van OSB: flour mill and gas filling in the same fence
Van Organized Industrial Zone on the Erciş road is not dedicated to a single sector. Meat processing, flour and feed; textiles; metal casting; brick, adhesive and marble; sponge and insulation, furniture, footwear, paper and hygiene products, detergent, oxygen and LPG filling, tire recycling and agricultural machinery manufacturing stand side by side. Erciş Organized Industrial Zone operates as a separate settlement.
This mixed character makes uniform "OSB package" maintenance impossible. Dust in flour and feed constantly triggers false alarms in incorrectly positioned detectors; fire load grows rapidly in sponge, furniture and footwear, sprinkler flow becomes critical; at filling facilities, gas detection and evacuation scenario are configured separately; in foundries, due to heat and sparks, beam or flame detection is discussed instead of point detectors. Factory and production facility maintenance is planned according to each parcel's own risk classification.
Milk line is seasonal, not permanent infrastructure
Geographically protected Van herbal cheese is produced mainly in Erciş and Gevaş regions during spring when sheep milk is abundant. Some dairies operate at full capacity during certain periods of the year and at reduced pace otherwise.
A common error we observe is slowing maintenance when production slows. Yet in an idle facility, the cooling machine room, control panels and cold storage remain energized. Detection in the compressor, local suppression inside the panel, detector selection adapted to the cold storage's temperature differential, and addressing freezing risk are tasks for the low-production season. A detector fouled by milk powder and oil becomes indistinguishable from false alarms regarding genuine events.
Public buildings, hospital floors and school storage
After the 2011 earthquake, Van's building stock was extensively renewed; public buildings, hospitals and university campuses were delivered with complete fire safety systems. Over the years that have passed, we encounter three situations: a fault alert silenced on the panel for years, an aging control unit battery unable to sustain the system during power outages, and a room subdivided during renovation that is not reflected in the detection plan at all. On hospital floors, the system room, imaging and archive require separate verification of the gas suppression cylinder pressure, evacuation time and room tightness.
Hotel floors and breakfast hall hood
Accommodation stock has grown with visitor traffic from Iran and Akdamar–Van Lake tourism; breakfast halls around Edremit create distinct density. Hotel and accommodation facility two main points stand out.
- Floor corridors and rooms: suspended ceiling changes in renovated decoration, detector remains in its old position. Audible alarm level should be measured behind a closed room door.
- Kitchen and breakfast hall: suppression over grill, fryer and stovetop hood is the most frequently omitted area. When equipment location changes, nozzle position becomes invalid; grease accumulation in the duct creates greater risk than the system itself.
How we come to Van from Ankara
ASPEK's headquarters is in Ankara Yenimahalle; we have no office or full-time staff in Van, nor have we established a structure opening branches province by province. We visit the city through planned regional tours covering eastern provinces: contracted facilities are scheduled in advance on the calendar, and requests from the same route are added. nationwide service our approach is built on this calendar.
For a malfunction, we begin remote preliminary diagnosis: when panel fault code, address number and panel photograph are shared, most of the problem is classified, and some is resolved on-site with facility personnel. We do not promise same-day site visit for Van; distance makes such a promise dishonest. Instead we give a realistic date and meet it. For Ankara, site visits are free.
Our preference is to avoid fragmented arrangements: from detection panel to water systems, from gas suppression to kitchen hood, the entire line is consolidated in a single contract; where requested, camera system maintenance is also added to the same visit. Scope and maintenance cost vary according to facility size; if the system is completely down emergency repair service the workflow is separate.
Which system is referred to which standard
We determine maintenance frequency not by our internal rules, but by the test set of the relevant standard itself:
| System | Typically in Van where | Standard referred to |
|---|---|---|
| Water sprinkler and pump room | Border trade warehouses, OSB production halls | TS EN 12845, NFPA 25 |
| Fire detection and alarm | Public buildings, hospital floors, hotel corridors | CEN/TS 54-14 |
| Gas extinguishing | System room, generator/UPS section, archive | wheeled devices must have |
| Kitchen hood suppression. | Breakfast hall, hotel kitchen, dining hall | NFPA 96, NFPA 17A |
| Fire cabinet and hose line | OSB parcels, cold storage perimeter | wheeled devices must have |
| Portable fire extinguishers | Warehouse corridor, forklift charging area, dairy | Portable fire extinguishers: |
Four most common findings we encounter in Van
- Stacking has risen, space between head and pallet is closed; water coverage cannot reach the shelf.
- Partition drawn for customs zone has divided the detection zone in two, panel plan is outdated.
- Diesel pump has not been operated for months; fuel and battery do not respond on first attempt in winter.
- Detector fouling in dairy and flour facility has normalized false alarms, system has been silenced.
To Set Up Your Maintenance Program
One contract, a solution for everything: we provide end-to-end maintenance to fire detection, gas suppression, sprinkler, hydrant, and pump units in their entirety; if you wish, camera (CCTV) system maintenance can also be added to the same contract.
If you do not have the brand, age, and last maintenance record of the existing system on hand, that is not a problem; the first step is anyway inventory and current condition assessment. Setting up an annual program without seeing what is there in the field means selling maintenance for a system that does not exist.
You can examine your system brand's product equivalents in our product catalog ; for requirements specific to your facility's use class, you can visit our sectoral solutions pages.
For survey and quotation you can or send your plan through our write or directly You can call call the number. Survey is free within Ankara; for facilities throughout Turkey, the visit plan is established jointly before contract.
Frequently Asked Questions
Do you have a branch or permanent crew in Van?
No. ASPEK is based in Ankara Yenimahalle and we did not establish a structure that opens branches city by city; we have no office, warehouse, or permanent staff in Van. We visit the city through planned regional tours covering eastern provinces. Contracted facilities are scheduled into these tour calendars in advance, and other requests in the same route are added to the same visit.
If the system fails, can you reach Van the same day?
We do not promise same-day inspection for Van; the distance between Ankara and Van does not make that promise honest. Instead, we begin with remote pre-diagnosis: when you share the panel fault code, address number, and panel photograph, the majority of the problem is classified before we depart, and some issues are resolved on-site through guidance to your facility's technical personnel. For the remaining work, we provide a realistic date and we meet it.
What information should we send when requesting a quotation for our warehouse?
It is sufficient that you describe your warehouse area with dimensions: enclosed area (m²) and free ceiling height, rack type with highest pallet elevation, presence or absence of intermediate-level sprinklers, type of stored material (packaging, plastic, food, aerosol, battery-powered equipment), whether the pump room is diesel or electric, forklift charging area, and presence or absence of bonded/segregated sections. With these details, we can largely foresee in advance whether the system is adequate for your current stacking arrangement.
How often should maintenance be performed?
We do not determine the interval; the standard to which each system is subject establishes its own inspection and test protocol. The table on this page shows line by line which standard governs which line: the pump room and sprinkler network are subject to TS EN 12845 and NFPA 25 operational and flow controls, the detection panel to CEN/TS 54-14 maintenance provisions. For the gaseous cylinder battery in the system room, we perform TS ISO 14520 weighing and seal integrity checks; for the hood line, we conduct NFPA 96 duct cleaning and NFPA 17A nozzle inspection as separate tasks; for hose cabinets we apply TS EN 671-3, and for portable devices TS 11827 is used as the basis. In Van, two local variables are added to this: if the warehouse stacking arrangement changes, intermediate inspection is moved forward; in flour-feed mills and similar facilities, detector cleaning is performed more frequently than the minimum interval due to dust and oil contamination.
Van OSB has different sectors; is the same maintenance package applied to all?
No, a single standard OSB package does not work. In Van OSB, flour-feed mills, metal foundries, sponge, furniture, footwear, and gas-filling operations are located side by side in the same zone. On the flour-feed side, dust-related detector placement and nuisance alarms take priority; in sponge-furniture areas, rapidly developing fire load and sprinkler flow rate; in filling operations, gas detection and evacuation scenario; in foundries, heat and spark make radiant or flame detector selection a key consideration. We plan each parcel in Erciş OSB and beyond according to its own risk classification.